boardgamevideo
  • Trending
  • Videos
  • Games
  • Channels
  • Lists
  • Shorts

Explore

  • Home
  • Trending
  • Channels
  • Videos
  • Games
  • Lists
  • Shorts
  • Conventions
  • Year in Review

Browse by type

  • Reviews
  • How to play
  • Playthroughs
  • Unboxing
  • Top 100 lists
  • Featured videos
  • Trending this week
  • Rising games
  • Games with fresh review perspectives

Information

  • About
  • Contact
  • Terms & Conditions
  • Privacy Policy

© 2022–2026 BoardGameVideo.com

Powered by BGG
  • Videos
  • Trending
  • Shorts
  • Channels
  • Games
  • Lists
Power Grid: Québec/Baden-Württemberg

Power Grid: Québec/Baden-Württemberg

Expansion

2012·Friedemann Friese

2 - 6 players
120 min
Heavy weight: Expect a long teach

From BoardGameGeek

The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mgawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW. In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks. In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins. Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts. Incorporates maps from: Mgawatts Funkenschlag: EnBW

Power Grid: Québec/Baden-Württemberg

Which Power Grid: Québec/Baden-Württemberg video should I watch?

Power Grid: Québec/Baden-Württemberg has 2 videos from 1 creator: 2 playthroughs. They date from February to November 2025.

If you like it, try Friday, Faiyum, Fishing and Findorff, also by Friedemann Friese.

All videos

Power Grid: Baden-Württemberg Expansion- 5p Teaching, Play-through, & Round table by Heavy CardboardPlaythrough3:18:41

Power Grid: Baden-Württemberg Expansion- 5p Teaching, Play-through, & Round table by Heavy Cardboard

Heavy Cardboard

Heavy Cardboard

Power Grid: Quebec w/ BOTH New PPs - 5p Teaching, Play-through, & RoundTable by Heavy CardboardPlaythrough2:30:05

Power Grid: Quebec w/ BOTH New PPs - 5p Teaching, Play-through, & RoundTable by Heavy Cardboard

Heavy Cardboard

Heavy Cardboard

Creators who cover this

All channels
Heavy Cardboard
Heavy Cardboard
2 videos of this game

Games like this

All games

Friday

2011·Friedemann Friese

Videos
64
Creators
53
Mainly how-to-play and reviews

1 players·25 min·Medium weight

Faiyum

2020·Friedemann Friese

Videos
48
Creators
33
Mainly reviews and how-to-play

1 - 5 players·110 - 140 min·Heavy weight

Fishing

2024·Friedemann Friese

Videos
28
Creators
22
Mainly reviews

3 - 5 players·40 - 60 min·Light weight

Findorff

2022·Friedemann Friese

Videos
26
Creators
21
Mainly reviews

1 - 5 players·75 min·Medium weight

About Power Grid: Québec/Baden-Württemberg

From BoardGameGeek:

The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mgawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW. In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks. In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins. Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts. Incorporates maps from: Mgawatts Funkenschlag: EnBW

Designer

Friedemann Friese

Artist

Lars-Arne "Maura" Kalusky

Publisher

2F-Spiele

Categories

EconomicIndustry / Manufacturing

Mechanics

Auction / BiddingResource ManagementMarket & TradingNetwork and Route Building
View on BoardGameGeek ›
Home
Games
Power Grid: Québec/Baden-Württemberg
cached: 123122